What Causes The Material To Be Thrown At The Discharge Port Of The Cement Mill

2022-06-22

1. The particle size of the material is too large

The larger particle size of the material will increase the grinding time of the cement ball mill, and if some larger materials cannot be crushed by the grinding body, it will also reduce the output power of the equipment and increase consumption. It will be thrown out of the discharge port.

2. Insufficient or untimely replenishment of steel balls in the cylinder

When the cement ball mill works for a long time, the wear of the grinding body will increase, the diameter will become smaller, and the impact force on the material will also decrease. Moreover, if the grinding body is not replenished in time, it will also lead to the decline of the product quality of the equipment.

3. The size and ratio of the grinding body in the equipment are not suitable

The size of the grinding body in the cement ball mill is not suitable, so that some materials cannot be crushed by impact. In addition, the proportion of the grinding body in the cylinder is not appropriate, which will cause the output power of the equipment to fail to reach the output power when it is put into operation. Therefore, it is necessary to further adjust the size and ratio of the grinding body.

4. The inner lining of the equipment cylinder is damaged

The lining plate in the equipment barrel can increase the friction with the grinding body, which is more conducive to lifting the grinding body and improving the processing capacity of the equipment. , there will be more energy consumption in the friction between the grinding body and the lining plate, not only can not improve the grinding body, but also cause the output power of the equipment to drop, resulting in material rejection.